Work continues to move along at The Jeaux where renovations in several areas are in progress.
• Currently, the outfield is being prepared for the laying of the new turf and after that, the extraction of the infield turf will occur with a new surface being placed.
• A brick wall around the McNeese bullpen area is in construction as is the new Dugout Club area which will be located behind the pitcher's area of the bullpen.
• A berm down the left field side has been set with the dirt used from the outfield. This will provide a great seating area for fans and kids.